What should a written window quotation include?

By The Scottish Window Guide editorial team · Last reviewed

Short answer

A written window quotation should identify every window, its specification, the installation work included, the total price and payment terms. It should also record exclusions, survey conditions, timescales and who handles any Scottish permissions or shared-ownership checks.

More detail

Ask for a room-by-room schedule showing quantities, dimensions, opening directions and drawings, with measurements marked as provisional or survey-confirmed. Name the manufacturer and system, frame material, internal and external finishes, glazing build-up, handles, locks, vents, cills and glazing bars.

Record any safety-glass or escape-opening provision identified for the project. Where thermal or acoustic performance matters, request product-specific manufacturer evidence for the quoted configuration; distinguish whole-window U-values from glass-only values. Fixed panes offer no opening ventilation, while inward-opening tilt-and-turn windows need clearance inside: the quotation should reflect how each room works.

State whether existing frames are removed or retained, and include perimeter insulation and sealing, trims, internal plaster repairs, external making good, decoration, waste removal and access equipment. A trim-covered finish and repaired plaster reveal are different scopes; neither should be hidden behind “installation included”.

Include the supplier’s legal identity and contact details, property address, quotation date and validity, itemised options, VAT treatment and total payable. Set out deposit and stage payments, indicative lead time, fitting duration and cancellation terms. Identify provisional allowances and require written agreement to variations before extra work proceeds. Attach any offered guarantee terms, including exclusions and responsibility for remedial work.

Building warrants, planning permission and listed building consent are separate questions; the local authority determines project-specific requirements. Shared ownership and title conditions need separate consideration. Record who establishes the position, submits any applications and pays associated costs, rather than treating “permissions included” as sufficient.

Frequently asked questions

Is “double glazing throughout” enough detail?
No. It leaves the frame system, glass specification, opening arrangement, ventilation and finishing work undefined, making comparisons unreliable.
What if the survey changes the specification?
Obtain a revised written quotation identifying changed dimensions, products, work and price before authorising manufacture.